Pipeline

Bodelwyddan, Denbighshire — North Wales

Bodelwyddan

An ultra-rapid EV charging hub in development in Bodelwyddan, North Wales — with ~1.5 MW of grid capacity secured via SP Energy Networks.

About this site

The Bodelwyddan hub is planned for a high-visibility site in Denbighshire, North Wales — a region with strong tourist and commuter flows along the A55 corridor but limited ultra-rapid charging provision. The site is well positioned to support long-distance and local drivers alike.

Moreco has secured ~1.5 MW of grid capacity through SP Energy Networks, unlocking an ultra-rapid hub powered by Alpitronic HYC-1000 units. The operator is to be confirmed. This is one of the highest-capacity hubs in Moreco's pipeline.

Aerial view of the Bodelwyddan site — Denbighshire, North Wales
Aerial view of the Bodelwyddan site — North Wales
Read the full case study ~1.5 MW secured — the full grid & delivery story

Why this site works

  • A55 corridor location — the primary route across North Wales, with heavy tourist and commuter flow but limited ultra-rapid provision.
  • ~1.5 MW secured — a scarce, high-capacity grid connection unlocked through SP Energy Networks.
  • High-capacity format — 14 bays powered by Alpitronic HYC-1000 units, among the largest in Moreco's pipeline.
  • Regional infrastructure gap — North Wales remains underprovided for public ultra-rapid charging.

How Moreco is delivering it

Moreco led the grid strategy from day one, working directly with SP Energy Networks to secure a ~1.5 MW connection — the critical enabler for a 14-bay ultra-rapid format. With grid in place, the project now moves into detailed design, planning submission, and operator selection ahead of construction mobilisation.

Programme milestones

Site identified
Site identified and assessedA55 corridor location selected for long-distance and regional demand
Grid
~1.5 MW connection securedGrid capacity confirmed via SP Energy Networks — unlocks 14-bay format
Planning
Planning submission in progressDetailed design and local authority engagement underway
TBC
Operator appointedOperator selection process in progress
TBC
Construction & energisationCivils, canopy and 14× Alpitronic HYC-1000 install